Both single and multilevel manufacturing optionally allow the cost of labour to be included as part the total cost within the manufacturing process.
To allow labour to be considered as a cost of manufacture, in Tools > Options > Stock, Include Labour in cost when Manufacturing must be ticked and the Linked offset account set up (see above).
On the Details tab of the stock code, the cost of Labour is included in Manufact. Cost, along with the cost of any stock.
Any labour stock code that will be included in the manufacture will also need to have a Manufact. Cost, which represents the cost of providing one unit (normally an hour) of labour. This can be overridden on the job itself.
In the example below, a Labour stock code (with a Manufact. Cost of $175.00) has been included in the manufacturing job. The value of the Manufactured stock code increases by the value set on Manufact Job, and the Labour Offset accounts and Inventory accounts are credited.
Here is the journal flow:
The Labour offset will reduce the overall P&L expense for actual labour cost, as this portion of wage expense is being transferred to inventory value.
|