Read Entry Period and Exclude Meter Reads Older Explanation

Back Top Prev Next Print

The MPS processing has two critical values in Options that affect when and how meter reads are processed. The global setting is available in Tools > Options > Contracts > Managed Print Services.

 

MeterReadEntry 

 

hmtoggle_arrow1Meter Read entry period (days)

 

hmtoggle_arrow1Exclude Meter Reads Older than (days)

 

hmtoggle_arrow1Example

 

info

Meter reads can be manually requested on a different date, as long as it falls within the dates outlined above.

 

hmtoggle_arrow1MPS Connector Specific Settings

 

Further information

Meter Billing Reports

Reset Meters to 0 in v4.3 Style Contracts

Reverse Incorrect Meter Reads

Meter Setup and Examples