Stock must be set up prior to adding meters, including macro descriptions on the Contracts tab.

 

Example Macros

{{Project.Meter.Counter Name}} {{Project.Job.Bill Date.Month}}

This will display the Meter Name and the Billing Month Name

 

Standalone Standard Black and Colour with Base Charge

standalone

 

Master Standard Black and Colour with Base Charge

masterstandard

 

The Base charge meter will need to be set to S (standalone) if you don’t want it to be charged per child contract. For example, master contract has 2 child contracts with a total rental charge of $50 across the board, so it's set to S to only be charged on the master contract.

 

If you wish to charge a rental per device, e.g master contract has 5 child contracts charged a rental of $10 each, you would set the meter to M (Master) so it copies it down to the child contracts

 

This time, there is a read of 500 black and 500 colour. The resulting job would look similar to the following:

 

masterjob

 

Further information

Standard B&W and Colour Cost per Copy Contract

Print Management Plans

PMP Contract with Quarterly Bi-Annually Yearly Overs Reconciliation

Simple Meter Examples

3 Tier Colour Coverage

Advanced Meter Setup

Base Charge and Base Rate

Black A3 and Black A4 Meter Min Volume Over the Two Meters

Black A3 and Separate A4 Meter

Clawback Meters

Contract with Total Meter

Estimate Meter Reads