Mark a Job as Ready |
Back Top Previous Next |
When users elect that there is no further work to be performed on a job and it is ready to leave the workflow, the job status must be changed to suit the situation (either Finish, RAI.NR or RAI.US). Jim2 then allows for two variations on what should happen next: linked to stock control or stock picking/packing requirements.
Choose which suits the company's work practices: ▪The job is finished and can be invoiced. An invoice can now be produced for this job. The job may involve some stock that could be back ordered if it is unavailable at the time of invoicing. ▪The finished job is ready to be invoiced. Jim2 needs to hold the stock involved in this job to ensure it is available at the time of invoicing and there will be no further input to this job.
To select a job as ready to invoice, use the Ready Icon : 1.Edit the job and change the status to Finish, RAI.NR or RAI.US. If the job is a service job, enter a description into the Fault Description and/or Invoice field in the Job header (these will appear on the invoice).
2.Click Set Job as Ready on the ribbon or use the F8 function key. The Mode field in the Job header changes to Ready.
|